Feedback
Why Join?

ABC Member 
Miller Construction Company

General Contractors

Miller Construction Company General Contractors Fort Lauderdale Florida
614 South Federal Highway
Fort Lauderdale
Florida
33301
P: (954) 764-6550
F: (954) 764-5418
Company Website
Founded In:
1973
Annual Volume:
> $50 million
Average Contract Amount:
$10 million - $19.9 million
Minority Business:
NO
Bondable:
YES
Projects:
159
Industry Connections:
58
Performance Ratings:
22
Average:
 

Miller Construction Company in Fort Lauderdale Florida Completed Projects

Miller Construction Company has the following completed projects.
 
Miller Construction Company 01. A Broadcasting Facility for WPLG
[view more info]
Type Office & General Commercial
Project 01. A Broadcasting Facility for WPLG - Pembroke Park, FL
Owner WPLG TV
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/09
Performance Rating
4.69
Miller Construction Company 02. Cornerstone Five Office Building
[view more info]
Type Office & General Commercial
Project 02. Cornerstone Five Office Building - Plantation, FL
Owner Patrinely Group, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/08
Performance Rating
5.00
Miller Construction Company 03. Imperial Point
[view more info]
Type Retail
Project 03. Imperial Point - Fort Lauderdale, FL
Owner AM Davis Mercantile Co.
Approx Contract Undisclosed
LEED N/A
Date Completed
Miller Construction Company 03. NSU University Center & Performing Arts Center
[view more info]
Type Education (Higher)
Project 03. NSU University Center & Performing Arts Center - Davie, FL
Owner Nova Southeastern University
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/07
Performance Rating
5.00
Miller Construction Company 04. Omni Building Revisions
[view more info]
Type Office & General Commercial
Project 04. Omni Building Revisions - Miami, FL
Owner Argent Ventures
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/09
Miller Construction Company 04. Republic Services Headquarters
[view more info]
Type Office & General Commercial
Project 04. Republic Services Headquarters - Sunrise, FL
Owner Republic Services, Inc.
Approx Contract Undisclosed
LEED Silver
Date Completed 08/01/08
Performance Rating
5.00
Miller Construction Company 04. Republic Truck Facility WPB
[view more info]
Type Industrial Warehousing & Distribution Centers
Project 04. Republic Truck Facility WPB - West Palm Beach, FL
Owner Republic Services, Inc.
Approx Contract Undisclosed
LEED Silver
Date Completed 06/01/10
Miller Construction Company 05. Leroy Collins Building
[view more info]
Type Office & General Commercial
Project 05. Leroy Collins Building - Miami Lakes, FL
Owner The Graham Companies
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/08
Performance Rating
4.88
Miller Construction Company 06. HCH 1C Outpatient Diagnostic Imaging
[view more info]
Type Healthcare
Project 06. HCH 1C Outpatient Diagnostic Imaging - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/07
Performance Rating
4.88
Miller Construction Company 07. RoboVault Storage
[view more info]
Type Industrial Warehousing & Distribution Centers
Project 07. RoboVault Storage - Fort Lauderdale, FL
Owner RoboVault
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/09
Performance Rating
5.00
Miller Construction Company 08. Orange Bowl Committee Headquarters
[view more info]
Type Office & General Commercial
Project 08. Orange Bowl Committee Headquarters - Miami Lakes, FL
Owner Orange Bowl Holdings, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/08
Performance Rating
4.81
Miller Construction Company 09. City Furniture
[view more info]
Type Retail
Project 09. City Furniture - Fort Myers, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/08
Performance Rating
5.00
Miller Construction Company 10. NSU University Dorm
[view more info]
Type Education (Higher)
Project 10. NSU University Dorm - Davie, FL
Owner Nova Southeastern University
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/07
Performance Rating
5.00
Miller Construction Company 11. Southern Wine & Spirits Office Building
[view more info]
Type Office & General Commercial
Project 11. Southern Wine & Spirits Office Building - Miramar, FL
Owner Southern Wine & Spirits
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/07
Miller Construction Company 12. Commerce Park Place I, II & III
[view more info]
Type Industrial Warehousing & Distribution Centers
Project 12. Commerce Park Place I, II & III - West Palm Beach, FL
Owner Integrated Property Services
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/06
Performance Rating
5.00
Miller Construction Company 13. HCH Parking Garage Addition
[view more info]
Type Parking Structures
Project 13. HCH Parking Garage Addition - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/05
Miller Construction Company 14. Himmarshee Landing
[view more info]
Type Office & General Commercial
Project 14. Himmarshee Landing - Fort Lauderdale, FL
Owner Las Olas Place II, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/05
Miller Construction Company 15. Ashley Furniture
[view more info]
Type Retail
Project 15. Ashley Furniture - Davie, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/05
Performance Rating
5.00
Miller Construction Company 16. Fifth Avenue Place Condominium
[view more info]
Type Multi-Family Residential
Project 16. Fifth Avenue Place Condominium - Boca Raton, FL
Owner Fifth Avenue Place, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/08
Performance Rating
4.44
Miller Construction Company 17. Tamarac Fire Station
[view more info]
Type Fire, Police & Emergency Service Stations
Project 17. Tamarac Fire Station - Tamarac, FL
Owner City of Tamarac
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/04
Miller Construction Company 18. Riverside Hotel Addition
[view more info]
Type Hotels & Hospitality
Project 18. Riverside Hotel Addition - Fort Lauderdale, FL
Owner The Las Olas Company
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/02
Miller Construction Company 19. Sonny's Enterprises Mfg. Facility
[view more info]
Type Manufacturing Plants
Project 19. Sonny's Enterprises Mfg. Facility - Tamarac, FL
Owner Sonny's Enterprises
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/01
Miller Construction Company 20. The Atrium at Broken Sound Office Building
[view more info]
Type Office & General Commercial
Project 20. The Atrium at Broken Sound Office Building - Boca Raton, FL
Owner 6111 Broken Sound, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/07
Performance Rating
5.00
Miller Construction Company 21. Shelton Dealership
[view more info]
Type Retail
Project 21. Shelton Dealership - Naples, FL
Owner Shelton Dealerships, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/04
Miller Construction Company 22. Plaza San Remo
[view more info]
Type Office & General Commercial
Project 22. Plaza San Remo - Coral Gables, FL
Owner Venera Holdings, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/08
Performance Rating
4.88
Miller Construction Company 23. NBC 6 Broadcast Facility
[view more info]
Type Office & General Commercial
Project 23. NBC 6 Broadcast Facility - Miramar, FL
Owner NBC Stations Management
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/00
Miller Construction Company 24. Monarch Professional Center
[view more info]
Type Office & General Commercial
Project 24. Monarch Professional Center - Miramar, FL
Owner Front Street Development Group
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/07
Miller Construction Company 25. JS Paluch
[view more info]
Type Manufacturing Plants
Project 25. JS Paluch - Coral Springs, FL
Owner JS Paluch
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/07
Miller Construction Company 26. Airbus Training Center
[view more info]
Type Office & General Commercial
Project 26. Airbus Training Center - Miami, FL
Owner Airbus Service Company, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/98
Miller Construction Company 27. City Furniture
[view more info]
Type Retail
Project 27. City Furniture - Stuart, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/06
Miller Construction Company 28. City/Ashley Furniture
[view more info]
Type Retail
Project 28. City/Ashley Furniture - Naples, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/08
Miller Construction Company 29. HCH Cancer Center
[view more info]
Type Healthcare
Project 29. HCH Cancer Center - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/01
Miller Construction Company 30. HCH Hospital Chapel
[view more info]
Type Religious & Community Facilities
Project 30. HCH Hospital Chapel - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/01
Miller Construction Company 31. HCH Operating Room Addition & Renovation
[view more info]
Type Healthcare
Project 31. HCH Operating Room Addition & Renovation - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/03
Miller Construction Company 32. Villa Tuscany
[view more info]
Type Multi-Family Residential
Project 32. Villa Tuscany - Fort Lauderdale, FL
Owner MAK Development Company, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/04
Miller Construction Company 33. Convergys Headquarters
[view more info]
Type Office & General Commercial
Project 33. Convergys Headquarters - Tamarac, FL
Owner Higgins Development
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/01
Miller Construction Company 34. Flamingo Square
[view more info]
Type Office & General Commercial
Project 34. Flamingo Square - Miramar, FL
Owner Flamingo Pavilion Associates
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/06
Performance Rating
4.81
Miller Construction Company 35. Lakeview Professional Village
[view more info]
Type Office & General Commercial
Project 35. Lakeview Professional Village - Coral Springs, FL
Owner Craig R. Weiner & Associates
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/02
Performance Rating
5.00
Miller Construction Company 36. Lawson Industries
[view more info]
Type Manufacturing Plants
Project 36. Lawson Industries - Medley, FL
Owner Ron & Harold Bailey
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/00
Miller Construction Company 37. LP Evans Mercedes Benz Dealership
[view more info]
Type Retail
Project 37. LP Evans Mercedes Benz Dealership - North Miami, FL
Owner LP Evans Motors, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/96
Miller Construction Company 38. Palmetto Park Boca Office Building
[view more info]
Type Office & General Commercial
Project 38. Palmetto Park Boca Office Building - Boca Raton, FL
Owner Parkwood Properties Group
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/97
Miller Construction Company 39. Parkside IV Office Building
[view more info]
Type Office & General Commercial
Project 39. Parkside IV Office Building - Miami Lakes, FL
Owner The Graham Companies
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/07
Performance Rating
4.88
Miller Construction Company 40. Signature Grand Conference and Catering Center
[view more info]
Type Convention Centers
Project 40. Signature Grand Conference and Catering Center - Davie, FL
Owner Signature Grand, Ltd.
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/96
Miller Construction Company 41. Weston Corporate Center
[view more info]
Type Office & General Commercial
Project 41. Weston Corporate Center - Weston, FL
Owner WF Buildings Ltd.
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/99
Miller Construction Company 42. HCH 3 Z Cath Lab
[view more info]
Type Healthcare
Project 42. HCH 3 Z Cath Lab - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/06
Performance Rating
5.00
Miller Construction Company 43. HCH Heart & Vascular Center
[view more info]
Type Healthcare
Project 43. HCH Heart & Vascular Center - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/01
Performance Rating
4.81
Miller Construction Company 44. Holy Cross Hospital Parking Garage
[view more info]
Type Parking Structures
Project 44. Holy Cross Hospital Parking Garage - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/89
Miller Construction Company 45. Lago Mar - Garage Addition
[view more info]
Type Parking Structures
Project 45. Lago Mar - Garage Addition - Fort Lauderdale, FL
Owner Lago Mar Properties
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/02
Miller Construction Company 46. Future Metals
[view more info]
Type Manufacturing Plants
Project 46. Future Metals - Tamarac, FL
Owner Future Metals, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/03
Miller Construction Company 47. Shoppes at Monarch
[view more info]
Type Retail
Project 47. Shoppes at Monarch - Miramar, FL
Owner Front Street Development Group
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/07
Miller Construction Company Act Mortgage Capital
[view more info]
Type Office & General Commercial
Project Act Mortgage Capital - Sunrise, FL
Owner ACT Lending Corporation
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/04
Miller Construction Company AHU Renovation
[view more info]
Type Healthcare
Project AHU Renovation - Plantation, FL
Owner Plantation General Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/03
Miller Construction Company Art Institute Kitchen Expansion
[view more info]
Type Education (Higher)
Project Art Institute Kitchen Expansion - Fort Lauderdale, FL
Owner Art Institute of Florida
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/03
Miller Construction Company BRCH 5th Floor Renovation
[view more info]
Type Healthcare
Project BRCH 5th Floor Renovation - Boca Raton, FL
Owner Boca Raton Community Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/03
Miller Construction Company BRCH Linear Accelerator
[view more info]
Type Healthcare
Project BRCH Linear Accelerator - Boca Raton, FL
Owner Boca Raton Community Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/04
Miller Construction Company Burlington Self Storage
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Burlington Self Storage - Oakland Park , FL
Owner Ron Cappozzoli
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/01
Miller Construction Company Burlington Storage
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Burlington Storage - Weston, FL
Owner Burlington Storage of Weston, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/04
Miller Construction Company Children's Diagnostic & Treatment Center
[view more info]
Type Healthcare
Project Children's Diagnostic & Treatment Center - Fort Lauderdale, FL
Owner Children's Diagnostic & Treatment Center
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/02
Miller Construction Company Church By The Sea Addition
[view more info]
Type Religious & Community Facilities
Project Church By The Sea Addition - Fort Lauderdale, FL
Owner Church By The Sea
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/01
Miller Construction Company City Furniture
[view more info]
Type Retail
Project City Furniture - Pompano Beach, FL
Owner Keith Koenig
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/00
Miller Construction Company City Furniture Exterior
[view more info]
Type Retail
Project City Furniture Exterior - Pembroke Pines, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/07
Miller Construction Company City Furniture Kevin Charles Cafe
[view more info]
Type Retail
Project City Furniture Kevin Charles Cafe - Stuart, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/06
Miller Construction Company City Furniture North Miami - Tower & Exterior
[view more info]
Type Retail
Project City Furniture North Miami - Tower & Exterior - Miami Gardens, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/07
Miller Construction Company City Furniture North Miami Interior
[view more info]
Type Retail
Project City Furniture North Miami Interior - Miami Gardens, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/08
Miller Construction Company City Furniture Showroom Renovation
[view more info]
Type Retail
Project City Furniture Showroom Renovation - Tamarac, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/06
Miller Construction Company City/Ashley Furniture WPB Reconstruction
[view more info]
Type Retail
Project City/Ashley Furniture WPB Reconstruction - West Palm Beach, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/06
Miller Construction Company Cleveland Clinic 3rd Floor
[view more info]
Type Healthcare
Project Cleveland Clinic 3rd Floor - Weston, FL
Owner Cleveland Clinic Florida
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/05
Miller Construction Company Cleveland Clinic 5-bed ICU & 10-bed PACU
[view more info]
Type Healthcare
Project Cleveland Clinic 5-bed ICU & 10-bed PACU - Weston, FL
Owner Cleveland Clinic
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/09
Miller Construction Company Cleveland Clinic 8 Bed Dialysis
[view more info]
Type Healthcare
Project Cleveland Clinic 8 Bed Dialysis - Weston, FL
Owner Cleveland Clinic Florida
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/10
Miller Construction Company Cleveland Clinic MOB
[view more info]
Type Healthcare
Project Cleveland Clinic MOB - Weston, FL
Owner Cleveland Clinic Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/04
Miller Construction Company Cleveland Clinic Pharmacy Expansion
[view more info]
Type Healthcare
Project Cleveland Clinic Pharmacy Expansion - Weston, FL
Owner Cleveland Clinic Florida
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/10
Miller Construction Company Cornerstone Five Buildout
[view more info]
Type Office & General Commercial
Project Cornerstone Five Buildout - Plantation, FL
Owner Patrinely Group, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/09
Miller Construction Company Cross Creek Apartments Buiding 9
[view more info]
Type Multi-Family Residential
Project Cross Creek Apartments Buiding 9 - Margate, FL
Owner Cross Creek Realty
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/06
Miller Construction Company Cross Creek Apartments Buildings 5 & 10
[view more info]
Type Multi-Family Residential
Project Cross Creek Apartments Buildings 5 & 10 - Margate, FL
Owner Cross Creek Realty
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/06
Miller Construction Company Doctors Hospital  Data Center & Data Closet Renovation
[view more info]
Type Healthcare
Project Doctors Hospital Data Center & Data Closet Renovation - Coral Gables, FL
Owner Baptist Health Systems
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/05
Miller Construction Company Document Imaging Building
[view more info]
Type Healthcare
Project Document Imaging Building - Hollywood, FL
Owner Memorial Health Systems
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/04
Miller Construction Company Fiber Optics Terminal Facility
[view more info]
Type Manufacturing Plants
Project Fiber Optics Terminal Facility - Fort Lauderdale, FL
Owner Williams Communications
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/00
Miller Construction Company Future Metals 250K Genset
[view more info]
Type Manufacturing Plants
Project Future Metals 250K Genset - Tamarac, FL
Owner Future Metals
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/07
Miller Construction Company Halmos Holdings
[view more info]
Type Office & General Commercial
Project Halmos Holdings - Fort Lauderdale, FL
Owner Halmos Holdings, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/03
Miller Construction Company HCH  5 South Ambassador Suites
[view more info]
Type Healthcare
Project HCH 5 South Ambassador Suites - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/06
Miller Construction Company HCH 19th Avenue East Parking Lot
[view more info]
Type Healthcare
Project HCH 19th Avenue East Parking Lot - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/03
Miller Construction Company HCH 2N ICU Critical Care
[view more info]
Type Healthcare
Project HCH 2N ICU Critical Care - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/06
Miller Construction Company HCH 3rd Floor Outpatient Surgery
[view more info]
Type Healthcare
Project HCH 3rd Floor Outpatient Surgery - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/07
Miller Construction Company HCH 3rd Floor Vascular Lab
[view more info]
Type Healthcare
Project HCH 3rd Floor Vascular Lab - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/03
Miller Construction Company HCH 4HC Cardiac Association CT Expansion
[view more info]
Type Healthcare
Project HCH 4HC Cardiac Association CT Expansion - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/06
Miller Construction Company HCH Arrhythmia Consultants Suite
[view more info]
Type Healthcare
Project HCH Arrhythmia Consultants Suite - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/03
Miller Construction Company HCH Building Renovation
[view more info]
Type Healthcare
Project HCH Building Renovation - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/02
Miller Construction Company HCH Cardio Rehabilitation
[view more info]
Type Healthcare
Project HCH Cardio Rehabilitation - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/03
Miller Construction Company HCH Cardiology
[view more info]
Type Healthcare
Project HCH Cardiology - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/03
Miller Construction Company HCH Cath Lab #5
[view more info]
Type Healthcare
Project HCH Cath Lab #5 - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/06
Miller Construction Company HCH Dr. Zachariah Space & Time Shared Physicians Office
[view more info]
Type Healthcare
Project HCH Dr. Zachariah Space & Time Shared Physicians Office - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/05
Miller Construction Company HCH Elevators 1 & 4
[view more info]
Type Healthcare
Project HCH Elevators 1 & 4 - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/07
Miller Construction Company HCH Emergency Room Renovation
[view more info]
Type Healthcare
Project HCH Emergency Room Renovation - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/03
Miller Construction Company HCH Healthplex Orthopedic Center
[view more info]
Type Healthcare
Project HCH Healthplex Orthopedic Center - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/08
Miller Construction Company HCH Internal Site Modifications
[view more info]
Type Healthcare
Project HCH Internal Site Modifications - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/03
Miller Construction Company HCH Interventional Vascular Lab
[view more info]
Type Healthcare
Project HCH Interventional Vascular Lab - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/03
Miller Construction Company HCH Linear Accelerator
[view more info]
Type Healthcare
Project HCH Linear Accelerator - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/03
Miller Construction Company HCH Turnlane on Commercial
[view more info]
Type Civil & Site Development
Project HCH Turnlane on Commercial - Fort Lauderdale, FL
Owner Holy Cross Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/03
Miller Construction Company Himmarshee Court
[view more info]
Type Healthcare
Project Himmarshee Court - Fort Lauderdale, FL
Owner Himmarshee Surgical Partners
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/05
Miller Construction Company Himmarshee Landing Tenant Improvements
[view more info]
Type Retail
Project Himmarshee Landing Tenant Improvements - Fort Lauderdale, FL
Owner Various
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/06
Miller Construction Company International Fine Arts College
[view more info]
Type Education (Higher)
Project International Fine Arts College - Fort Lauderdale, FL
Owner The Art Institute
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/02
Miller Construction Company Iron Mountain Phase II
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Iron Mountain Phase II - Miami, FL
Owner Iron Mountain Records
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/01
Miller Construction Company JMC Radiology Renovation Phase 2 & 3
[view more info]
Type Healthcare
Project JMC Radiology Renovation Phase 2 & 3 - Jupiter, FL
Owner Jupiter Medical Center
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/04
Miller Construction Company Lago Mar Spa Addition
[view more info]
Type Hotels & Hospitality
Project Lago Mar Spa Addition - Fort Lauderdale, FL
Owner Lago Mar Properties
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/02
Miller Construction Company Lakeview Misc. Tenant Improvements
[view more info]
Type Office & General Commercial
Project Lakeview Misc. Tenant Improvements - Coral Springs, FL
Owner Various
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/03
Miller Construction Company Lauderdale Storage Replacement
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Lauderdale Storage Replacement - Fort Lauderdale, FL
Owner Lauderdale Storage, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/07
Miller Construction Company Liddell Residence
[view more info]
Type Luxury Custom Residential
Project Liddell Residence - Fort Lauderdale, FL
Owner Mr. & Mrs. Liddell
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/03
Miller Construction Company MCVI Neuro Interventional Lab
[view more info]
Type Healthcare
Project MCVI Neuro Interventional Lab - South Miami, FL
Owner Baptist Hospital of Miami
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/04
Miller Construction Company Memorial Pembroke Hurricane Roof Tie Down
[view more info]
Type Healthcare
Project Memorial Pembroke Hurricane Roof Tie Down - pembroke pines, FL
Owner Memorial Health Systems
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/05
Miller Construction Company MHS Warehouse Building
[view more info]
Type Healthcare
Project MHS Warehouse Building - Hollywood, FL
Owner Memorial Health Systems
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/04
Miller Construction Company Miramar Park of Commerce IX
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Miramar Park of Commerce IX - Miramar, FL
Owner Sunbeam Properties
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/96
Miller Construction Company Miramar Park of Commerce X
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Miramar Park of Commerce X - Miramar, FL
Owner Sunbeam Properties
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/97
Miller Construction Company Miramar Park of Commerce XII
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Miramar Park of Commerce XII - Miramar, FL
Owner Sunbeam Properties
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/98
Miller Construction Company MLA Design Center
[view more info]
Type Office & General Commercial
Project MLA Design Center - West Palm Beach, FL
Owner Miller Legg & Associates
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/03
Miller Construction Company NBC 6 Broadcast Facility 2nd Floor Addition
[view more info]
Type Office & General Commercial
Project NBC 6 Broadcast Facility 2nd Floor Addition - Miramar, FL
Owner NBC Stations Management
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/00
Miller Construction Company Nova Southeastern University College Drive Entry
[view more info]
Type Education (Higher)
Project Nova Southeastern University College Drive Entry - Davie, FL
Owner Nova Southeastern University
Approx Contract Undisclosed
LEED N/A
Date Completed
Miller Construction Company Nova Southeastern University Computer School
[view more info]
Type Education (Higher)
Project Nova Southeastern University Computer School - Davie, FL
Owner John Santulli
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/00
Miller Construction Company Nova Southeastern University East Rosenthal
[view more info]
Type Education (Higher)
Project Nova Southeastern University East Rosenthal - Davie, FL
Owner Nova Southeastern University
Approx Contract Undisclosed
LEED N/A
Date Completed
Miller Construction Company Nova Southeastern University Performing/Visual Arts
[view more info]
Type Education (Higher)
Project Nova Southeastern University Performing/Visual Arts - Davie, FL
Owner Nova Southeastern University
Approx Contract Undisclosed
LEED N/A
Date Completed
Miller Construction Company Nova Southeastern University Shark Fountain
[view more info]
Type Education (Higher)
Project Nova Southeastern University Shark Fountain - Davie, FL
Owner Nova Southeastern University
Approx Contract Undisclosed
LEED N/A
Date Completed
Miller Construction Company NSU Student Dining
[view more info]
Type Education (Higher)
Project NSU Student Dining - Davie, FL
Owner Nova Southeastern University
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/07
Miller Construction Company Omni Shell Renovation
[view more info]
Type Office & General Commercial
Project Omni Shell Renovation - Miami, FL
Owner 1601 Biscayne Blvd, LLC
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/04
Miller Construction Company Omni Technology Center Renovation
[view more info]
Type Office & General Commercial
Project Omni Technology Center Renovation - Miami, FL
Owner Argent Ventures
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/02
Miller Construction Company Pace Center for Girls
[view more info]
Type Religious & Community Facilities
Project Pace Center for Girls - Wilton Manors, FL
Owner PACE
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/02
Miller Construction Company PBCC Admin & LLRC Elevator
[view more info]
Type Education (Higher)
Project PBCC Admin & LLRC Elevator - Lake Worth, FL
Owner Palm Beach Community College
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/05
Miller Construction Company PBCC Classroom Buildings
[view more info]
Type Education (Higher)
Project PBCC Classroom Buildings - Lake Worth , FL
Owner Palm Beach Community College
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/04
Miller Construction Company PBCC Eissey Campus Bathroom
[view more info]
Type Education (Higher)
Project PBCC Eissey Campus Bathroom - Palm Beach Gardens, FL
Owner Palm Beach Community College
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/05
Miller Construction Company PBCC ETC 148 Classroom Remodel
[view more info]
Type Education (Higher)
Project PBCC ETC 148 Classroom Remodel - Lake Worth, FL
Owner Palm Beach Community College
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/05
Miller Construction Company PBCC Fire Main Extension
[view more info]
Type Education (Higher)
Project PBCC Fire Main Extension - Lake Worth, FL
Owner Palm Beach Community College
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/05
Miller Construction Company PBCC Gym Renovation
[view more info]
Type Education (Higher)
Project PBCC Gym Renovation - Lake Worth, FL
Owner Palm Beach Community College
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/06
Miller Construction Company Pharmacia & Upjohn
[view more info]
Type Office & General Commercial
Project Pharmacia & Upjohn - Miramar, FL
Owner Liberty Property Trust
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/01
Miller Construction Company Plantation General Hospital EMAR
[view more info]
Type Healthcare
Project Plantation General Hospital EMAR - Plantation, FL
Owner PGH Limited Partnership
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/04
Miller Construction Company Plantation General Hospital Pharmacy Renovation
[view more info]
Type Healthcare
Project Plantation General Hospital Pharmacy Renovation - Plantation, FL
Owner Plantation General Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/05
Miller Construction Company Poulsen Lighting
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Poulsen Lighting - Weston, FL
Owner Poulsen Lighting, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 06/01/96
Miller Construction Company Private Residence
[view more info]
Type Luxury Custom Residential
Project Private Residence - Fort Lauderdale, FL
Owner Private Owner
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/01
Miller Construction Company Reach the Children
[view more info]
Type Religious & Community Facilities
Project Reach the Children - Fort Lauderdale, FL
Owner Book of Hope International
Approx Contract Undisclosed
LEED N/A
Date Completed 07/01/00
Miller Construction Company Regions Bank Tenant Improvements 1st Floor
[view more info]
Type Retail
Project Regions Bank Tenant Improvements 1st Floor - Fort Lauderdale, FL
Owner Regions Financial
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/05
Miller Construction Company Restaurant Depot
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Restaurant Depot - Pompano Beach, FL
Owner Jetro Holdings, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/04
Miller Construction Company Sawgrass Professional Center
[view more info]
Type Office & General Commercial
Project Sawgrass Professional Center - Sunrise, FL
Owner Miller Development Company
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/02
Miller Construction Company Sensomatic
[view more info]
Type Office & General Commercial
Project Sensomatic - Boca Raton, FL
Owner Sensomatic Electronics
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/93
Miller Construction Company Shoppes at Lakeview
[view more info]
Type Retail
Project Shoppes at Lakeview - Coral Springs, FL
Owner Lakeview Retail, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/04
Miller Construction Company Site Work @ Alico Lakes Center
[view more info]
Type Civil & Site Development
Project Site Work @ Alico Lakes Center - Fort Myers, FL
Owner City Furniture
Approx Contract Undisclosed
LEED N/A
Date Completed 01/01/09
Miller Construction Company Sonny's Enterprises Addition
[view more info]
Type Manufacturing Plants
Project Sonny's Enterprises Addition - Tamarac, FL
Owner Fazio Holdings, Inc.
Approx Contract Undisclosed
LEED N/A
Date Completed 04/01/05
Miller Construction Company South Miami Hospital Data Center
[view more info]
Type Healthcare
Project South Miami Hospital Data Center - Miami, FL
Owner South Miami Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/04
Miller Construction Company Space Plus North Palm Village
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Space Plus North Palm Village - Tampa, FL
Owner Space Plus Storage Centers
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/00
Miller Construction Company Sterling Records Management Storage
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Sterling Records Management Storage - Boynton Beach, FL
Owner The Litchfield Cos.
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/01
Miller Construction Company Sturgeon Residence
[view more info]
Type Luxury Custom Residential
Project Sturgeon Residence - Fort Lauderdale, FL
Owner Mr. & Mrs. Sturgeon
Approx Contract Undisclosed
LEED N/A
Date Completed 12/01/04
Miller Construction Company T & H Office Building
[view more info]
Type Office & General Commercial
Project T & H Office Building - Tamarac, FL
Owner T & H Acquisitions
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/01
Miller Construction Company Tamarac Public Services Renovation
[view more info]
Type Municipal & Government
Project Tamarac Public Services Renovation - Tamarac, FL
Owner City of Tamarac
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/04
Miller Construction Company Telecom Switch Hotel
[view more info]
Type Office & General Commercial
Project Telecom Switch Hotel - Fort Lauderdale, FL
Owner Argent Ventures
Approx Contract Undisclosed
LEED N/A
Date Completed 02/01/01
Miller Construction Company Temple Dor Dorim
[view more info]
Type Religious & Community Facilities
Project Temple Dor Dorim - Weston, FL
Owner Temple Dor Dorim
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/04
Miller Construction Company Townsend Place Condos
[view more info]
Type Multi-Family Residential
Project Townsend Place Condos - Boca Raton, FL
Owner Boca Developers
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/03
Miller Construction Company Turnpike Distribution Center Phase II & III
[view more info]
Type Industrial Warehousing & Distribution Centers
Project Turnpike Distribution Center Phase II & III - Pompano Beach, FL
Owner Integrated Property Services
Approx Contract Undisclosed
LEED N/A
Date Completed 09/01/05
Miller Construction Company University Hospital 3rd Floor Cosmetic Upgrade
[view more info]
Type Healthcare
Project University Hospital 3rd Floor Cosmetic Upgrade - Tamarac, FL
Owner University Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/03
Miller Construction Company University Hospital Facade Renovation
[view more info]
Type Healthcare
Project University Hospital Facade Renovation - Tamarac, FL
Owner University Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 05/01/03
Miller Construction Company University Hospital Pharmacy Relocation
[view more info]
Type Healthcare
Project University Hospital Pharmacy Relocation - Fort Lauderdale, FL
Owner University Hospital
Approx Contract Undisclosed
LEED N/A
Date Completed 08/01/03
Miller Construction Company University Hospital Radiology Room Addition
[view more info]
Type Healthcare
Project University Hospital Radiology Room Addition - Fort Lauderdale, FL
Owner University Hospital HCA
Approx Contract Undisclosed
LEED N/A
Date Completed 03/01/02
Miller Construction Company WRMC Cath Lab / Mobile Unit
[view more info]
Type Healthcare
Project WRMC Cath Lab / Mobile Unit - Plantation, FL
Owner Weside Regional Medical
Approx Contract Undisclosed
LEED N/A
Date Completed 10/01/04
Miller Construction Company WTVJ Window on Miami
[view more info]
Type Office & General Commercial
Project WTVJ Window on Miami - Miami, FL
Owner WTVJ / NBC Channel 6
Approx Contract Undisclosed
LEED N/A
Date Completed 11/01/01